Reconstruction of 40bay 15kV network switching station

Scope of works:

  • preparing the executive designs,
  • making the lighting installation and sockets,
  • construction of earthing installation,
  • making the alarm, fire and Gazex system
  • installing the 40bays of the ZX0 switching station,
  • installing the cabinets for: telemechanics, communication, RPW220V DC and RPW 230/400V AC,
  • complex startup--measurement works.

ZX0 switchgear from ABB

Ex-BEL_Z protections from ELKOMTECH

MST-2 controller from ELKOMTECH

RPW 220V DC from APS